Application
Building materials industry
Engineering case
Serial Number |
User Name |
Project Name |
Order Date |
1 |
Guangzhou Lasca Engineering Consulting Co., Ltd. |
Energy Recycling Project of Shanghai Chemical Industry Zone Shengda Waste Treatment Co., Ltd. (Supply and Construction Contract) |
2016.4 |
2 |
Guangzhou Lasca Engineering Consulting Co., Ltd. (Northeast Pharmaceutical) |
Rotary kiln, secondary combustion chamber, connecting flue, quench tower refractory lining works and external insulation works(Supply and Construction Contract) |
2016.3 |
3 |
China National Petroleum Seventh Construction Co., Ltd. |
Procurement contract for lining materials, etc. |
2019.12 |
4 |
Maoming Guangxi Chemical Co., Ltd |
Two sulfur incinerators(Supply and Construction Contract) |
2019.6 |
5 |
Tongling Zhengyuan Environmental Engineering Technology Co., Ltd. |
Refractory lining replacement of kiln head cover, rotary kiln and secondary combustion chamber in Tongling hazardous waste centralized disposal center |
2019.10 |
6 |
JIANGSU YANXIN TECHNOLOGY CO., LTD |
7307G waste heat recovery castable lining(Supply and Construction Contract) |
2017.10 |
7 |
Tongling Zhengyuan Environmental Engineering Technology Co., Ltd. |
Incinerator lining replacement(Supply and Construction Contract) |
2018.8.28 |
8 |
China National Petroleum Seventh Construction Co., Ltd. (Kazakhstan) |
Procurement contract for refractory brick lining materials, etc. |
2019.6 |
9 |
Wuxi Taihe Maosheng Technology Co., Ltd. (Thailand Project) |
50000 tons/year insurance powder project Sulfur incinerator(Supply and Construction Contract) |
2018.5 |
10 |
Suzhou Hailu Heavy Industry Co., Ltd. |
Masteel Electric Furnace Refractory(Supply and Construction Contract) |
2019.6 |
11 |
Zhangjiagang Hailu Sha Zhou Technology Co., Ltd. |
Sulfur furnace waste pot, incinerator waste pot, lining material procurement, construction contract |
2019.8 |